Route 1 South Ramps to Route 16 Under Flag Control for Construction Work

Motorists traveling on Route 1 southbound should expect delays at the Route 16 interchange due to ongoing construction work requiring flagging operations.

The construction activities are affecting both the on and off ramps connecting Route 1 southbound to Route 16, with traffic control personnel directing vehicles through the work area.

The flagging operations are scheduled to continue until 6 a.m., after which normal traffic flow is expected to resume.

Drivers are advised to allow extra travel time and exercise caution when approaching the work zone.